Project: Mobil FCCU
|
Altona, Victoria, Australia
|
 |
|
This major project at the Mobil Oil Altona refinery involved the design and construction of a new 23,000 BPD FCC unit. In addition to the new process unit, substantial modifications to existing facilities were required. Including: upgrading of existing utilities, road works, drainage and a new electrical substation. Shedden Uhde worked in conjunction with the main process contractor, Toyo Engineering of Japan and prepared the front-end and detailed design of all facilities outside battery limits, various upgrades of other refinery units, utilities design, tie-ins and interface work. Shedden Uhde continued through with assistance during the construction phase.
|